Laos Cement Plant Project

项目介绍

  Project Name: Laos Cement Plant Project
  Stocks: cement plant construction equipment and supplies
  Quantity: 28000 square
  Large cargo: cement mill, grate cooler, roller press, belt, etc.
  Largest piece: 80 tons
  Ho Chi Minh Port: Shanghai, China
  Unloading port: Thailand
  Project location: Vientiane Province, Laos
  Transportation solution: SIRUI provides "port-to-door" integrated logistics services, including port collection, customs declaration, shipping and land transportation.

项目详情

Due to the tight construction period of the customer, if the normal transportation operation time is used, the goods cannot be delivered to the project site on time. SIRUI believes that customers not only save time by unloading ships and trucks in the evening to save time for customers, but also transport goods to their destinations at the fastest speed through waterway transport.

目的港卸船

Cargo on barge

Ship unloading at port of destination
June to September of each year is the rainy season in Southeast Asia. In this season, Thailand and Laos after the continuous heavy rain, the roads are muddy and the river level is soaring, which causes great difficulties in transportation.


Flooded bridge after heavy rain

Road conditions after a heavy rain
In this case, the SIR Logistics team worked together to overcome difficulties, meet roads and build roads, see bridges and bridges, and finally transport the goods to their destinations.


Under construction

Passing muddy road

Ground Freight
Thailand's new road policy has imposed stricter requirements on land transportation. In order to be able to execute the project smoothly, the Sirius project team communicated with the Thai road administration department in time to obtain a transportation permit in time to ensure that the goods reached their destination on time.


 

Towing large goods through complex roads